| | TEMPORARY FENCE (TYPE DESERT TORTOISE), CONSTRUCTION SITE MANAGEMENT LUMP SUM, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY FIBER ROLL, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY CONCRETE WASHOUT (PORTABLE), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, ABANDON INLET, REMOVE METAL BEAM GUARD RAILING, REMOVE ROADSIDE SIGN, REMOVE INLET, COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE CRASH CUSHION (SAND FILLED), CLEARING AND GRUBBING, ROADWAY EXCAVATION, DUFF, EROSION CONTROL (DRY SEED), ROLLED EROSION CONTROL PRODUCT (BLANKET), HOT MIX ASPHALT (TYPE A) RUMBLE STRIP, PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, MINOR CONCRETE (MINOR STRUCTURE), 18" REINFORCED CONCRETE PIPE, 24" CORRUGATED STEEL PIPE (.109" THICK), CORRUGATED STEEL PIPE DOWNDRAIN, 24" ENTRANCE TAPER , 18" STEEL FLARED END SECTION, ROCK SLOPE PROTECTION (NO. 1, METHOD B), ROCK SLOPE PROTECTION FABRIC, FRAME AND GRATE, OBJECT MARKER (TYPE L-1), CONCRETE BARRIER (TYPE 60GC), 4" THERMOPLASTIC TRAFFIC STRIPE, 4" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12), THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), PAVEMENT MARKER (REFLECTIVE-RECESSED), MAINTAINING EXISTING TRAFFIC MANAGEMENT, SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFY TRAFFIC MONITORING STATION, MOBILIZATION, ALL TRUCKING AND MISC. MATERIALS.
| |
| | We are an equal opportunity employer and will consider all bids submitted. We especially encourage firms certified as a UDBE by Caltrans to submit bids. If you are interested in this project we are more than willing to discuss in detail what assistance we can provide you. Subcontractors must possess current insurance and worker's compensation coverage. However, certified UDBE's are encouraged to contact Bowman Asphalt and request assistance if they are unable to meet Bowman Asphalt's standard bonding or insurance requirements. UDBE's are also encouraged to contact Bowman Asphalt for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. | |