| | Date Of Advertisement Placement: 3/9/2012 4:15:15 PM | |
| | | |
| | Teichert Construction | |
| | An Equal Opportunity Employer, | |
| | is requesting quotations from all qualified | |
| | DVBE | |
| | sub-contractors and material suppliers for the following project: | |
| | | |
| | 04-2E5204 | |
| | City/Location: Rio Vista
| |
| | County: Solano | |
| | | |
| | Owner: Caltrans | |
| | | |
| | Bid Date: Wednesday 3/21/2012 at 2:00 PM |
| |
| | | |
| | We are requesting bids for the following trades and/or supplies: | |
| | Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Grinding, SWPP, Lead Compliance Plan, Striping & Markers, Paving Fabric and Paving Oil, AC Dike, MBGR and Trucking. Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DVBE participation. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. | |
| | NAICS ClassificationsSector 23--Construction All Other Specialty Trade ContractorsOther Heavy and Civil Engineering Construction |
| |
| | CSI ClassificationsDIVISION 1 - GENERAL CONSTRUCTION MATERIALS -- GENERALTRUCKING-HEAVY HAULING | DIVISION 2 - SITE WORK PAVEMENT MARKING | |
| |
| | | |
| | Bid documents can be viewed at or obtained from: | |
| | Caltrans Website Teichert has also made the plans and specs available at http://TeichertPlanRoom.com Public Jobs (You have to register to download plans or specs, there is no cost to register or download), plans can also be purchased from this website.
| |
| | | |
| | 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DVBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DVBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services.
Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. | |
| | | |
| | Teichert Construction | |
| | 24207 County Road 100A
| |
| | Davis, CA 95616 | |
| | Phone: (916) 645-4876 Fax: (530) 406-4299 | |
| | John Gale | |
| | jgale@teichert.com | |
| | | |
| | Published on 3/8/2012 1:00:00 PM by The Weekly Bid Flash a Trade and Focus Publication located at www.theweeklybidflash.com Phone: 1.800.479.5314 Fax: 1.619.688.0585
This solicitation Ad will run until the bid date | |
| | | |